POM todo blueprints

Native todo is the only live task tracker. The active stage prompt instructs OMP to initialize the exact phase blueprint from src/domain.ts; POM does not maintain a competing todo database.

T0 Foundation

  • Resolve project identity
  • Define creative north star
  • Record constraints and assumptions
  • Create project brief
  • Initialize canonical state
  • Validate Task 0 gate

T1 Genre

  • Map genre candidates
  • Research current genre context
  • Analyze clichés and differentiation
  • Build fusion matrix
  • Rank top directions
  • Lock genre promise
  • Save grid and matrix
  • Validate Task 1 gate

T2 Voice

  • Design original persona
  • Define audience and philosophy
  • Check rights boundaries
  • Define voice profile
  • Write always and avoid laws
  • Create original sample
  • Save persona and guide
  • Validate Task 2 gate

T3 Store

  • Generate twenty diverse concepts
  • Enforce structural diversity
  • Score concept potential
  • Rank strongest five
  • Compare top three
  • Select and strengthen winner
  • Save store and direction
  • Validate Task 3 gate

T4 Bible

  • Finalize story identity
  • Write full ending synopsis
  • Define dramatic and thematic questions
  • Build character bible
  • Build world and rules
  • Build themes and frameworks
  • Create timeline and ledgers
  • Map mysteries and payoffs
  • Create visual bible
  • Run continuity audit
  • Resolve contradictions
  • Validate Task 4 gate

T5 Outline

  • Design acts and sequences
  • Map turning points
  • Allocate narrative weight
  • Build causal scene index
  • Track state changes
  • Link setups and payoffs
  • Audit agency and escalation
  • Repair weak causality
  • Validate Task 5 gate

T6 Chapters

  • Map every chapter
  • Define chapter state changes
  • Balance POV and pacing
  • Verify timeline transitions
  • Verify reveals and payoffs
  • Prepare representative visual
  • Save chapter outline
  • Update scene index
  • Validate Task 6 gate

T7 Draft

  • Load chapter dependencies
  • Verify current canon state
  • Set chapter objective
  • Draft complete chapter
  • Preserve voice and POV
  • End in changed state
  • Measure words
  • Run voice and repetition checks
  • Update canon and ledgers
  • Repeat remaining chapters
  • Run full manuscript review
  • Validate Task 7 gate

T8 Delivery

  • Compile manuscript
  • Compile requested exports
  • Assemble approved visuals
  • Run structure and content checks
  • Run continuity and rights checks
  • Verify manifest and hashes
  • Create fresh final ZIP
  • Test every ZIP member
  • Write delivery report
  • Provide real artifact path
  • Disclose warnings and omissions
  • Validate Task 8 gate